Belleville Utilities Commission collection
- CA ON00156 2017-79
- Collection
- 1915-1969
The collection consists of three items:
1) Circular letters from the Hydro Electric Power Commission of Ontario, filed in a binder by the Belleville office, 1915-1927
2) Hydro-Electric Power Commission of Ontario reports on Frequency Standardization, 1948, with A.M.E.U. report on the reports
3) Belleville Utilities Commission contract for the construction of water purification plant extensions, 1969 with Gore & Storrie Limited, consulting engineers of Toronto
Belleville Utilities Commission